Around this site

← Back to Xinjiang

Onshore wind · China

Xinjiang Toksun (Zhongtai) Captive Green Power Substitution wind farm

Under construction1150 MWChecked 8 October 2026Last changed in the dataset 22 April 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Xinjiang Toksun (Zhongtai) Captive Green Power Substitution wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
1150 MW
Status
Under construction (Construction)
Owner
Xinjiang Zhongtai (Group) Co Ltd
Location
Turpan, Xinjiang, China

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Xinjiang Toksun (Zhongtai) Captive Green Power Substitution wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.