Onshore wind · China

Xinjiang - Sichuan Power Export wind farms

Planned (permitted)4040 MWChecked 8 October 2026Last changed in the dataset 17 January 2026

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Xinjiang - Sichuan Power Export wind farms sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
4040 MW
Status
Planned (permitted) (Pre-construction)
Operator
Three Gorges Bazhou Ruoqiang Energy
Owner
Yangtze Three Gorges Investment Management Co Ltd [16%]; Three Gorges Capital Holding Co Ltd [16%]; China Three Gorges New Energy Co Ltd [34%]; China Yangtze Power Co Ltd [33%]
Location
Bayingolin, Xinjiang, China
First operating
2026
Phases in the tracker
3

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Xinjiang - Sichuan Power Export wind farms. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.