Battery storage · United Kingdom
Wilton International, Greystones Road - Phase 1
Operator Sembcorp Utilities (UK) Limited
Operational150 MWData checked 16 November 2026Source record dated 10 October 2023
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Wilton International, Greystones Road - Phase 1 is a 150 MW battery storage site on the edge of Eston, Cleveland, United Kingdom. Its planning application (R/2023/0545/CL) went to Redcar and Cleveland on 11 August 2023 and was granted on 4 October 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 64 other energy sites within 10 km, 20 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Wilton International, Greystones Road - Phase 1 changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
30 settled days to 7 Nov: 5,381 MWh out and 6,200 MWh in, active 67% of half hours, peak 25 MW of 150. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The company behind this site
SEMBCORP UTILITIES (UK) LIMITED (04636301), active, since 2003. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 150 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational (Planning Permission Granted)
- Operator or applicant
- Sembcorp Utilities (UK) Limited
- Owner
- Sembcorp Utilities (UK) Limited
- Location
- Wilton International, Lazenby, Cleveland, TS6 8JH, United Kingdom
- Planning authority
- Redcar and Cleveland
- Planning application
- R/2023/0545/CL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for R/2023/0545/CL, with what the planning evidence pack adds for this site.
Every application in Redcar and Cleveland · Alerts for applications and incidents near here
Timeline
- 11 August 2023 Planning application submitted
- 4 October 2023 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Wilton International, Greystones Road - Phase 1. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Wilton International, Greystones Road - Phase 1 had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Wilton International, Greystones Road - Phase 1; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Wilton International, Greystones Road - Phase 1?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 10 October 2023.
- Where is Wilton International, Greystones Road - Phase 1?
- On the edge of Eston, Cleveland, United Kingdom (postcode TS6 8JH).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).