Planning pack for this site, £295Other options

Solar · United Kingdom

Wickham Hall Estate Solar Photovoltaic Farm

Operator Endurance Energy Wickham Hall Limited

Awaiting Construction35 MWData checked 16 November 2026Source record dated 23 February 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wickham Hall Estate Solar Photovoltaic Farm is a 35 MW solar farm 3.6 km north-west of Bishops Stortford, Hertfordshire, United Kingdom. Its planning application (3/21/2601/FUL) went to East Hertfordshire on 30 November 2021 and was granted on 19 December 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wickham Hall Estate Solar Photovoltaic Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1514, Garage fire destroys solar panels in Southgate, with a battery storage fault suspected, 33 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected33 kmMinor
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium34 kmMinor
EIR-15302023Electrical fault causes solar panel fire in Wickford house42 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
35 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Endurance Energy Wickham Hall Limited
Location
Land At Wickham Hall Estate Bishops Stortford, Hertfordshire, CM23 1JG, United Kingdom
Planning authority
East Hertfordshire
Planning application
3/21/2601/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 3/21/2601/FUL, with what the planning evidence pack adds for this site.

Every application in East Hertfordshire · Alerts for applications and incidents near here

  • 30 November 2021 Planning application submitted
  • 19 December 2023 Planning permission granted
  • 19 December 2026 Planning permission runs out

None found. The register holds no published incident that names Wickham Hall Estate Solar Photovoltaic Farm. If you know of one, report it (confidential reports are anonymised).

Has Wickham Hall Estate Solar Photovoltaic Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wickham Hall Estate Solar Photovoltaic Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wickham Hall Estate Solar Photovoltaic Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 February 2026.
Where is Wickham Hall Estate Solar Photovoltaic Farm?
3.6 km north-west of Bishops Stortford, Hertfordshire, United Kingdom (postcode CM23 1JG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).