Planning pack for this site, £295Other options

Solar · United Kingdom

WHS Plastics, Water Orton Lane - Solar Panels

Operator WHS Plastics Limited

Awaiting Construction1.1 MWData checked 16 November 2026Source record dated 13 January 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

WHS Plastics, Water Orton Lane - Solar Panels is a 1.1 MW solar farm on the edge of Castle Vale, West Midlands, United Kingdom. Its planning application (2024/06773/PA) went to North Warwickshire on 28 October 2024 and was granted on 19 December 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 75 other energy sites within 10 km, 60 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for WHS Plastics, Water Orton Lane - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 8.2 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college8.2 kmMinor
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home42 kmSignificant
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge49 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
WHS Plastics Limited
Location
W H S Plastics Ltd Water Orton Lane, West Midlands, B76 9BG, United Kingdom
Planning authority
North Warwickshire
Planning application
2024/06773/PA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2024/06773/PA, with what the planning evidence pack adds for this site.

Every application in North Warwickshire · Alerts for applications and incidents near here

  • 28 October 2024 Planning application submitted
  • 19 December 2024 Planning permission granted

None found. The register holds no published incident that names WHS Plastics, Water Orton Lane - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has WHS Plastics, Water Orton Lane - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names WHS Plastics, Water Orton Lane - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of WHS Plastics, Water Orton Lane - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2025.
Where is WHS Plastics, Water Orton Lane - Solar Panels?
On the edge of Castle Vale, West Midlands, United Kingdom (postcode B76 9BG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).