Onshore wind · United States
Whitetail Wind Farm
Operator Invenergy Services LLC
Planned67.2 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Whitetail Wind Farm is a 67.2 MW wind farm 24 km north of Platteville, Grant County, Wisconsin, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There are 5 other energy sites within 10 km, 2 of them wind farms. The register holds no incident at this site. It holds 107 incidents at wind farms in the United States, and 362 worldwide.
Get an email when Whitetail Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Whitetail Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 105 comparable onshore wind incidents in the United States, nearest first. The nearest is EIR-1349, Storm-damaged wind turbine demolished with explosives near Mechanicsville, 134 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1349 | 2024 | Storm-damaged wind turbine demolished with explosives near Mechanicsville | 134 km | Minor |
| EIR-0886 | 2023 | Wind turbine collapses at Butler Ridge Wind Farm in Wisconsin | 169 km | Significant |
| EIR-1373 | 2023 | Wind turbine collapses in Dodge County, with the cause still unreported | 169 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 102 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 67.2 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Planned
- Operator
- Invenergy Services LLC
- Owner
- Invenergy Services LLC
- Location
- Grant County, Wisconsin, United States
- Expected
- 2027
- Balancing authority
- MISO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Whitetail Wind Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Whitetail Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Whitetail Wind Farm; it holds 107 incidents at wind farms in the United States.
- What is the status of Whitetail Wind Farm?
- Planned, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Whitetail Wind Farm?
- 24 km north of Platteville, Grant County, Wisconsin, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).