Solar · United States
Waterton Solar II
Operator Public Service Co of Colorado
Under construction4 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Waterton Solar II is a 4 MW solar farm 3.2 km north-east of Roxborough Park, Douglas County, Colorado, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 5 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when Waterton Solar II changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Waterton Solar II sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-0487, Tornado wrecks Pioneer Solar Farm near Bennett, Colorado, 62 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0487 | 2025 | Tornado wrecks Pioneer Solar Farm near Bennett, Colorado | 62 km | Significant |
| EIR-1777 | 2023 | Hail-damaged solar array near Scottsbluff returns to service | 288 km | Minor |
| EIR-1475 | 2026 | Solar panel fire displaces residents at Amarillo apartment complex | 556 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 4 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Under construction
- Operator
- Public Service Co of Colorado
- Owner
- Public Service Co of Colorado
- Location
- Douglas County, Colorado, United States
- Expected
- 2026
- Balancing authority
- PSCO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Waterton Solar II. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Waterton Solar II had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Waterton Solar II; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of Waterton Solar II?
- Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Waterton Solar II?
- 3.2 km north-east of Roxborough Park, Douglas County, Colorado, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).