Planning pack for this site, £295Other options

Solar · United Kingdom

Volkswagen Group UK, Garamonde Drive - Solar Panels

Operator Volkswagen Group UK Limited

Awaiting Construction0.7 MWData checked 16 November 2026Source record dated 2 December 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Volkswagen Group UK, Garamonde Drive - Solar Panels is a 0.7 MW solar farm on the edge of Milton Keynes, Buckinghamshire, United Kingdom. Its planning application (24/01527/PRIOR) went to Milton Keynes on 12 September 2024 and was granted on 21 January 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 109 other energy sites within 10 km, 63 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Volkswagen Group UK, Garamonde Drive - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1493, Solar panels catch fire on Bedford warehouse roof, 29 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14932026Solar panels catch fire on Bedford warehouse roof29 kmMinor
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough30 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering40 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Volkswagen Group UK Limited
Location
Volkswagen Group Uk Ltd Garamonde Drive Wymbush, Buckinghamshire, MK8 8DF, United Kingdom
Planning authority
Milton Keynes
Planning application
24/01527/PRIOR

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01527/PRIOR, with what the planning evidence pack adds for this site.

Every application in Milton Keynes · Alerts for applications and incidents near here

  • 12 September 2024 Planning application submitted
  • 21 January 2025 Planning permission granted

None found. The register holds no published incident that names Volkswagen Group UK, Garamonde Drive - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Volkswagen Group UK, Garamonde Drive - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Volkswagen Group UK, Garamonde Drive - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Volkswagen Group UK, Garamonde Drive - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2025.
Where is Volkswagen Group UK, Garamonde Drive - Solar Panels?
On the edge of Milton Keynes, Buckinghamshire, United Kingdom (postcode MK8 8DF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).