Around this site

← Back to Buenos Aires

Onshore wind · Argentina

Villalonga wind farm

Operational91.5 MWChecked 8 October 2026Last changed in the dataset 12 March 2025

Technology
Onshore wind
Capacity
91.5 MW
Status
Operational (Operating)
Operator
Genneia
Owner
Genneia SA [100%]
Location
Partido de Patagones, Buenos Aires, Argentina
First operating
2018
Phases in the tracker
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Villalonga wind farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.