← Back to Essex
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Verge At Rickstones Road Battery Storage (Verge By Ricksones School, Rickstones Road - Micro Energy Storage)

Operator AMP Clean Energy · Owner Battery Box Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 7 November 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Verge At Rickstones Road Battery Storage (Verge By Ricksones School, Rickstones Road - Micro Energy Storage) is a 0.2 MW battery storage site on the edge of Witham, Essex, United Kingdom. Its planning application (25/01124/FUL) went to Braintree on 29 May 2025 and was granted on 28 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 42 other energy sites within 10 km, 16 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

AMP CLEAN ENERGY LIMITED (11320925), active, since 2018. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Verge At Rickstones Road Battery Storage (Verge By Ricksones School, Rickstones Road - Micro Energy Storage) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 40 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction40 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire177 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells187 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
AMP Clean Energy
Owner
Battery Box Limited
Location
Verge By Ricksones School, Rickstones Road, Witham, Essex, CM8 3GW, United Kingdom
Planning authority
Braintree
Planning application
25/01124/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/01124/FUL, with what the planning evidence pack adds for this site.

Every application in Braintree · Alerts for applications and incidents near here

  • 29 May 2025 Planning application submitted
  • 28 July 2025 Planning permission granted
  • 28 July 2028 Planning permission runs out

None found. The register holds no published incident that names Verge At Rickstones Road Battery Storage (Verge By Ricksones School, Rickstones Road - Micro Energy Storage). If you know of one, report it (confidential reports are anonymised).

Has Verge At Rickstones Road Battery Storage (Verge By Ricksones School, Rickstones Road - Micro Energy Storage) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Verge At Rickstones Road Battery Storage (Verge By Ricksones School, Rickstones Road - Micro Energy Storage); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Verge At Rickstones Road Battery Storage (Verge By Ricksones School, Rickstones Road - Micro Energy Storage)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 November 2025.
Where is Verge At Rickstones Road Battery Storage (Verge By Ricksones School, Rickstones Road - Micro Energy Storage)?
On the edge of Witham, Essex, United Kingdom (postcode CM8 3GW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).