Battery storage · United Kingdom

Tynemouth Energy Storage System (TESS)

Operator Enel (formerly Element Power) · Owner Tynemouth Battery Storage Limited

Operational25 MWData checked 16 November 2026Source record dated 3 August 2018

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Tynemouth Energy Storage System (TESS) is a 25 MW battery storage site 3.6 km west of North Shields, Tyne and Wear, United Kingdom. Its planning application (16/01451/FUL) went to North Tyneside on 8 September 2016. It has been operating since 25 May 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 89 other energy sites within 10 km, 19 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

368 energy sites within 40 km for Tynemouth Energy Storage System (TESS)

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Enel (formerly Element Power)
Owner
Tynemouth Battery Storage Limited
Location
Newcastle, Tyne and Wear, NE27 0NB, United Kingdom
Planning authority
North Tyneside
Planning application
16/01451/FUL
First operating
2018

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 16/01451/FUL, with what the planning evidence pack adds for this site.

Every application in North Tyneside · Alerts for applications and incidents near here

  • 8 September 2016 Planning application submitted
  • 25 May 2018 Operational
  • 20 December 2018 Construction started

None found. The register holds no published incident that names Tynemouth Energy Storage System (TESS). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Tynemouth Energy Storage System (TESS) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tynemouth Energy Storage System (TESS); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tynemouth Energy Storage System (TESS)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 August 2018.
Where is Tynemouth Energy Storage System (TESS)?
3.6 km west of North Shields, Tyne and Wear, United Kingdom (postcode NE27 0NB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).