Solar · Brazil

Turvânia solar farm

Planned (permitted)400 MWChecked 8 October 2026Last changed in the dataset 11 June 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Turvânia solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
400 MW
Status
Planned (permitted) (Pre-construction)
Owner
Enercom Energias Renováveis Ltda [100%]
Location
Turvânia, Região Geográfica Intermediária de São Luís de Montes Belos-Iporá, Goiás, Brazil
Phases in the tracker
8

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Turvânia solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.