Planning pack for this site, £295Other options

Solar · United Kingdom

Trinity High School And Sixth Form Centre, Easemore Road - Solar Panels

Operator Trinity High School & Sixth Form Centre

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 20 May 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Trinity High School And Sixth Form Centre, Easemore Road - Solar Panels is a 0.3 MW solar farm in Redditch, Worcestershire, United Kingdom. Its planning application (25/00013/PRIOR) went to Redditch on 17 January 2025 and was granted on 15 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Trinity High School And Sixth Form Centre, Easemore Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college19 kmMinor
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home21 kmSignificant
EIR-15512019Fire involving solar panels on a garage roof in Shropshire54 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Trinity High School & Sixth Form Centre
Location
Trinity High School And Sixth Form Centre Easemore Road, Worcestershire, B98 8HB, United Kingdom
Planning authority
Redditch
Planning application
25/00013/PRIOR

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/00013/PRIOR, with what the planning evidence pack adds for this site.

Every application in Redditch · Alerts for applications and incidents near here

  • 17 January 2025 Planning application submitted
  • 15 April 2025 Planning permission granted

None found. The register holds no published incident that names Trinity High School And Sixth Form Centre, Easemore Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Trinity High School And Sixth Form Centre, Easemore Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Trinity High School And Sixth Form Centre, Easemore Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Trinity High School And Sixth Form Centre, Easemore Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 May 2025.
Where is Trinity High School And Sixth Form Centre, Easemore Road - Solar Panels?
In Redditch, Worcestershire, United Kingdom (postcode B98 8HB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).