← Back to Northamptonshire

Energy sites / United Kingdom / Northamptonshire

Battery storage · United Kingdom

Trinity Centre, Sinclair Drive - Energy Storage System

Awaiting Construction0.2 MWChecked 6 October 2026Last changed in the dataset 27 April 2026

Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
AMP Clean Energy
Location
West Of Junction With Trinity Centre Sinclair Drive, Northamptonshire, NN8 6ZB, United Kingdom
Planning authority
North Northamptonshire
Planning application
25/01556/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 22 October 2025 Planning application submitted
  • 25 February 2026 Planning permission granted
  • 25 February 2029 Planning permission expired

None found. The register holds no published incident that names Trinity Centre, Sinclair Drive - Energy Storage System. If you know of one, report it (confidential reports are anonymised).

The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack sets out every comparable incident for one project, with sources. £295, by email in minutes.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.