Solar · United States
Trigo Sol Solar CSG
Under construction4.6 MWChecked 26 October 2026
Trigo Sol Solar CSG is a 4.6 MW solar farm 3.8 km east of Belen, Valencia County, New Mexico, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 154 incidents at solar farms in the United States, and 390 worldwide.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Trigo Sol Solar CSG sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, launch price £145 See a sample pack (PDF)
Get an email when Trigo Sol Solar CSG changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preview of the planning evidence pack for this site
The pack for this site lists 154 comparable solar incidents in the United States, nearest first. The nearest is EIR-1475, Solar panel fire displaces residents at Amarillo apartment complex, 451 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1475 | 2026 | Solar panel fire displaces residents at Amarillo apartment complex | 451 km | Minor |
| EIR-0679 | 2012 | Battery storage failure reported at solar integration site in Flagstaff, Arizona | 452 km | Significant |
| EIR-1886 | 2015 | Rooftop solar panels catch fire at Apple's Mesa plant being converted to a data centre | 489 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 151 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 4.6 MW
- Status
- Under construction
- Operator
- Trigo Sol Solar
- Location
- Valencia County, New Mexico, United States
- Expected
- 2027
- Balancing authority
- PNM
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Trigo Sol Solar CSG. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Trigo Sol Solar CSG had a fire or other incident?
- None is on the register as of 29 October 2026. The register holds no published incident that names Trigo Sol Solar CSG; it holds 154 incidents at solar farms in the United States.
- What is the status of Trigo Sol Solar CSG?
- Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Trigo Sol Solar CSG?
- 3.8 km east of Belen, Valencia County, New Mexico, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).