Torksey Ferry Road, Rampton - Battery Energy Storage is a 500 MW battery storage site 9.7 km south of Gainsborough, Nottinghamshire, United Kingdom. Its planning application (24/01470/FUL) went to Bassetlaw on 23 December 2024 and was granted on 2 June 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 40 other energy sites within 10 km, 15 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Torksey Ferry Road, Rampton - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 29 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells29 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool141 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire192 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
500 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Tribus Clean Energy Limited
Location
S/O Torksey Ferry Road, Rampton, Retford, Nottinghamshire, DN22 0HT, United Kingdom
Planning authority
Bassetlaw
Planning application
24/01470/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01470/FUL, with what the planning evidence pack adds for this site.

Every application in Bassetlaw · Alerts for applications and incidents near here

  • 23 December 2024 Planning application submitted
  • 2 June 2026 Planning permission granted
  • 2 June 2031 Planning permission runs out

None found. The register holds no published incident that names Torksey Ferry Road, Rampton - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Torksey Ferry Road, Rampton - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Torksey Ferry Road, Rampton - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Torksey Ferry Road, Rampton - Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 June 2026.
Where is Torksey Ferry Road, Rampton - Battery Energy Storage?
9.7 km south of Gainsborough, Nottinghamshire, United Kingdom (postcode DN22 0HT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).