Battery storage · United Kingdom
Cottom Power Station
Operator EDF Energy Thermal Generation Limited
Application Submitted50 MWData checked 16 November 2026Source record dated 12 January 2021
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Cottom Power Station is a 50 MW battery storage site 8.9 km south of Gainsborough, Nottinghamshire, United Kingdom. Its planning application (20/01288/CTP) went to Bassetlaw on 13 October 2020. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 41 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Cottom Power Station changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cottom Power Station sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 30 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 30 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 142 km | Major |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 193 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 50 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- EDF Energy Thermal Generation Limited
- Location
- Cottam Power Station, Nottinghamshire, DN22 0EU, United Kingdom
- Planning authority
- Bassetlaw
- Planning application
- 20/01288/CTP
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20/01288/CTP, with what the planning evidence pack adds for this site.
Every application in Bassetlaw · Alerts for applications and incidents near here
Timeline
- 13 October 2020 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Cottom Power Station. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Cottom Power Station had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cottom Power Station; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Cottom Power Station?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 12 January 2021.
- Where is Cottom Power Station?
- 8.9 km south of Gainsborough, Nottinghamshire, United Kingdom (postcode DN22 0EU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).