← Back to Alberta
Planning pack for this site, £295Other options

Solar · Canada

Tilley solar farm

Owner First Nation Power Development; Concord Green Energy; Alexander First Nation

Planned (permitted)21 MWData checked 8 October 2026Source record dated 6 March 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tilley solar farm is a 21 MW solar farm 16 km east of Brooks, County of Newell, Alberta, Canada. Its status in the Global Energy Monitor solar and wind trackers is planned (permitted). No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 4 incidents at solar farms (hybrid battery and solar sites included) in Canada, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tilley solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 4 comparable solar incidents in Canada, nearest first. The nearest is EIR-1701, Solar panels and roof catch fire at SimTech Supply Chain Management in West Lorne, 2440 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-17012025Solar panels and roof catch fire at SimTech Supply Chain Management in West Lorne2440 kmMinor
EIR-15112016Solar panels catch fire on roof of Mississauga home2517 kmMinor
EIR-01612026Battery fire at Summerside Sunbank solar farm triggers evacuation order3498 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 1 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
21 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Planned (permitted) (Pre-construction)
Owner
First Nation Power Development; Concord Green Energy; Alexander First Nation
Location
County of Newell, Alberta, Canada

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Tilley solar farm. If you know of one, report it (confidential reports are anonymised).

Has Tilley solar farm had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Tilley solar farm; it holds 4 incidents at solar farms (hybrid battery and solar sites included) in Canada.
What is the status of Tilley solar farm?
Planned (permitted), in the Global Energy Monitor solar and wind trackers, where it last changed on 6 March 2025.
Where is Tilley solar farm?
16 km east of Brooks, County of Newell, Alberta, Canada.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).