Solar · Canada
Tilley solar farm
Owner First Nation Power Development; Concord Green Energy; Alexander First Nation
Planned (permitted)21 MWData checked 8 October 2026Source record dated 6 March 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tilley solar farm is a 21 MW solar farm 16 km east of Brooks, County of Newell, Alberta, Canada. Its status in the Global Energy Monitor solar and wind trackers is planned (permitted). No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 4 incidents at solar farms (hybrid battery and solar sites included) in Canada, and 480 worldwide.
Get an email when Tilley solar farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in Canada. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tilley solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 4 comparable solar incidents in Canada, nearest first. The nearest is EIR-1701, Solar panels and roof catch fire at SimTech Supply Chain Management in West Lorne, 2440 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1701 | 2025 | Solar panels and roof catch fire at SimTech Supply Chain Management in West Lorne | 2440 km | Minor |
| EIR-1511 | 2016 | Solar panels catch fire on roof of Mississauga home | 2517 km | Minor |
| EIR-0161 | 2026 | Battery fire at Summerside Sunbank solar farm triggers evacuation order | 3498 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 1 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 21 MW
- Capacity figure from
- Global Energy Monitor solar and wind trackers
- Status
- Planned (permitted) (Pre-construction)
- Owner
- First Nation Power Development; Concord Green Energy; Alexander First Nation
- Location
- County of Newell, Alberta, Canada
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Tilley solar farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Tilley solar farm had a fire or other incident?
- None is on the register as of 22 November 2026. The register holds no published incident that names Tilley solar farm; it holds 4 incidents at solar farms (hybrid battery and solar sites included) in Canada.
- What is the status of Tilley solar farm?
- Planned (permitted), in the Global Energy Monitor solar and wind trackers, where it last changed on 6 March 2025.
- Where is Tilley solar farm?
- 16 km east of Brooks, County of Newell, Alberta, Canada.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).