Planning pack for this site, £295Other options

Solar · Germany

Thirteen Seven - Wedel

Operator Greeno Solarprojekt 153 GmbH & Co. KG

Planned2.3 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Thirteen Seven - Wedel is a 2.3 MW solar farm on the edge of Wedel, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 2 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 6 incidents at solar farms in Germany, and 456 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Thirteen Seven - Wedel sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 6 comparable solar incidents in Germany, nearest first. The nearest is EIR-2629, Fire breaks out in technical room of Hesse solar park, 322 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-26292024Fire breaks out in technical room of Hesse solar park322 kmSignificant
EIR-13282026Battery storage fire at solar installation in Reichenbachnot mappedSignificant
EIR-28392026Battery storage at solar park near Schnaittenbach, Germany, burns outnot mappedSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 3 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
2.3 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Greeno Solarprojekt 153 GmbH & Co. KG
Location
Wedel, Pinneberg, Schleswig-Holstein, 22880, Germany
First operating
2027

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Thirteen Seven - Wedel. If you know of one, report it (confidential reports are anonymised).

Has Thirteen Seven - Wedel had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names Thirteen Seven - Wedel; it holds 6 incidents at solar farms in Germany.
What is the status of Thirteen Seven - Wedel?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Thirteen Seven - Wedel?
On the edge of Wedel, Germany (postcode 22880).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).