Solar · United Kingdom
The Whittle Estate, Whetstone - Solar PV system
Operator Whetstone Marine Power Test Facility
Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 4 November 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
The Whittle Estate, Whetstone - Solar PV system is a 0.4 MW solar farm in Whetstone, Leicestershire, United Kingdom. Its planning application (21/0754/PT14J) went to Blaby on 24 September 2021 and was granted on 26 October 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 48 other energy sites within 10 km, 33 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when The Whittle Estate, Whetstone - Solar PV system changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for The Whittle Estate, Whetstone - Solar PV system sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2151, Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge, 12 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2151 | 2018 | Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge | 12 km | Significant |
| EIR-1554 | 2026 | Fire involving solar panels at a Market Harborough house spreads to an adjoining property | 18 km | Significant |
| EIR-1545 | 2024 | Fire involving solar panels on a building under construction in Kettering | 36 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Whetstone Marine Power Test Facility
- Location
- G E Energy Power Conversion Ltd, Block 82, The Whittle Estate, ( Alstom Site) Cambridge Road, Whetstone, LEICESTER, Leicestershire, LE8 6LH, United Kingdom
- Planning authority
- Blaby
- Planning application
- 21/0754/PT14J
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/0754/PT14J, with what the planning evidence pack adds for this site.
Every application in Blaby · Alerts for applications and incidents near here
Timeline
- 24 September 2021 Planning application submitted
- 26 October 2021 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names The Whittle Estate, Whetstone - Solar PV system. If you know of one, report it (confidential reports are anonymised).
Questions
- Has The Whittle Estate, Whetstone - Solar PV system had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names The Whittle Estate, Whetstone - Solar PV system; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of The Whittle Estate, Whetstone - Solar PV system?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 November 2021.
- Where is The Whittle Estate, Whetstone - Solar PV system?
- In Whetstone, Leicestershire, United Kingdom (postcode LE8 6LH).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).