← Back to Lincolnshire

Battery storage · United Kingdom

The Hollies

Operator Spencer Farm Produce · Owner Rwe Renewables UK Swindon Limited

Planning Permission Expired24 MWData checked 16 November 2026Source record dated 26 February 2020

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

The Hollies is a 24 MW battery storage site 6.3 km west of Skegness, Lincolnshire, United Kingdom. Its planning application (S/039/00841/17) went to East Lindsey on 12 May 2017. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 17 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

118 energy sites within 40 km for The Hollies

Members see the sites and incidents around this one, and every record behind them.

RWE RENEWABLES UK SWINDON LIMITED (02550622), active, since 1990. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with RE)
Capacity
24 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Spencer Farm Produce
Owner
Rwe Renewables UK Swindon Limited
Location
The Hollies, High Lane, Croft, Lincolnshire, PE24 4SH, United Kingdom
Planning authority
East Lindsey
Planning application
S/039/00841/17

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/039/00841/17, with what the planning evidence pack adds for this site.

Every application in East Lindsey · Alerts for applications and incidents near here

  • 12 May 2017 Planning application submitted
  • 17 July 2020 Planning permission expired

None found. The register holds no published incident that names The Hollies. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has The Hollies had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names The Hollies; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of The Hollies?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 26 February 2020.
Where is The Hollies?
6.3 km west of Skegness, Lincolnshire, United Kingdom (postcode PE24 4SH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).