Planning pack for this site, £295Other options

Solar · United Kingdom

The Graham Sports Centre, Maiden Castle - Solar Pv Panels

Operator Durham University

Awaiting ConstructionData checked 16 November 2026Source record dated 29 September 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

The Graham Sports Centre, Maiden Castle - Solar Pv Panels is a solar farm on the edge of Durham, County Durham, United Kingdom. Its planning application (DM/23/02325/PNS) went to County Durham on 2 August 2023 and was granted on 20 September 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 39 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for The Graham Sports Centre, Maiden Castle - Solar Pv Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1502, Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre, 16 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre16 kmMinor
EIR-14992025Solar panels linked to fires at council buildings in Northumberland36 kmSignificant
EIR-27212025Solar panel fire breaks out at Shanklea Primary School36 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Durham University
Location
The Graham Sports Centre, Maiden Castle, Durham, County Durham, DH1 3SE, United Kingdom
Planning authority
County Durham
Planning application
DM/23/02325/PNS

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/23/02325/PNS, with what the planning evidence pack adds for this site.

Every application in County Durham · Alerts for applications and incidents near here

  • 2 August 2023 Planning application submitted
  • 20 September 2023 Planning permission granted

None found. The register holds no published incident that names The Graham Sports Centre, Maiden Castle - Solar Pv Panels. If you know of one, report it (confidential reports are anonymised).

Has The Graham Sports Centre, Maiden Castle - Solar Pv Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names The Graham Sports Centre, Maiden Castle - Solar Pv Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of The Graham Sports Centre, Maiden Castle - Solar Pv Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 September 2023.
Where is The Graham Sports Centre, Maiden Castle - Solar Pv Panels?
On the edge of Durham, County Durham, United Kingdom (postcode DH1 3SE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).