← Back to Norfolk

Energy sites / United Kingdom / Norfolk

Battery storage · United Kingdom

The Everest System

Operational0.1 MWChecked 6 October 2026Last changed in the dataset 3 November 2016

Technology
Battery storage (Stand-alone Storage)
Capacity
0.1 MW
Status
Operational
Operator or applicant
Connected Energy
Location
Lotus Car Factory, Potash Ln, Hethel, Norwich NR14 8EZ, Norfolk, NR14 8EZ, United Kingdom
Planning authority
South Norfolk
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 21 February 2008 Planning application submitted
  • 19 December 2015 Construction started
  • 19 January 2016 Operational

None found. The register holds no published incident that names The Everest System. If you know of one, report it (confidential reports are anonymised).

The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.