← Back to Derbyshire
Planning pack for this site, £295Other options

Solar · United Kingdom

The Bemrose School, Uttoxeter New Road - Solar Panels

Operator Solar Options for Schools Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 23 June 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

The Bemrose School, Uttoxeter New Road - Solar Panels is a 0.2 MW solar farm on the edge of Derby, United Kingdom. Its planning application (26/00451/PNRPV) went to Derby on 8 April 2026 and was granted on 1 June 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 36 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

SOLAR OPTIONS FOR SCHOOLS LIMITED (09812345), active, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for The Bemrose School, Uttoxeter New Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1265, Solar panels catch fire and destroy three buildings in Harby, 41 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12652024Solar panels catch fire and destroy three buildings in Harby41 kmSignificant
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge43 kmSignificant
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall45 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Solar Options for Schools Limited
Location
The Bemrose School Uttoxeter New Road, Derbyshire, DE22 3HU, United Kingdom
Planning authority
Derby
Planning application
26/00451/PNRPV

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/00451/PNRPV, with what the planning evidence pack adds for this site.

Every application in Derby · Alerts for applications and incidents near here

  • 8 April 2026 Planning application submitted
  • 1 June 2026 Planning permission granted

None found. The register holds no published incident that names The Bemrose School, Uttoxeter New Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has The Bemrose School, Uttoxeter New Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names The Bemrose School, Uttoxeter New Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of The Bemrose School, Uttoxeter New Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 June 2026.
Where is The Bemrose School, Uttoxeter New Road - Solar Panels?
On the edge of Derby, United Kingdom (postcode DE22 3HU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).