Solar · United Kingdom
The Adidas Centre, Hazel Grove - Solar Array
Operator Private Developer
Awaiting Construction0.6 MWData checked 16 November 2026Source record dated 9 February 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
The Adidas Centre, Hazel Grove - Solar Array is a 0.6 MW solar farm on the edge of Hazel Grove, Cheshire, United Kingdom. Its planning application (DC/086562) went to Stockport on 26 September 2022 and was granted on 1 February 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 58 other energy sites within 10 km, 35 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when The Adidas Centre, Hazel Grove - Solar Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for The Adidas Centre, Hazel Grove - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 28 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1244 | 2018 | Fire reported to have started in solar panels at Westleigh primary school | 28 km | Significant |
| EIR-1485 | 2026 | Faulty solar panel wiring sparks house fire in Stoke-on-Trent | 34 km | Minor |
| EIR-1546 | 2025 | Solar panel isolation switch overheats in roof fire at a house in Bucknall | 39 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Private Developer
- Location
- The Adidas Centre Pepper Road Hazel Grove, Cheshire, SK7 5SA, United Kingdom
- Planning authority
- Stockport
- Planning application
- DC/086562
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DC/086562, with what the planning evidence pack adds for this site.
Every application in Stockport · Alerts for applications and incidents near here
Timeline
- 26 September 2022 Planning application submitted
- 1 February 2023 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names The Adidas Centre, Hazel Grove - Solar Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has The Adidas Centre, Hazel Grove - Solar Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names The Adidas Centre, Hazel Grove - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of The Adidas Centre, Hazel Grove - Solar Array?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 February 2023.
- Where is The Adidas Centre, Hazel Grove - Solar Array?
- On the edge of Hazel Grove, Cheshire, United Kingdom (postcode SK7 5SA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).