Onshore wind · Vietnam

Thăng Long wind farm

Planned (permitted)96 MWChecked 8 October 2026Last changed in the dataset 23 June 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Thăng Long wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
96 MW
Status
Planned (permitted) (Pre-construction)
Owner
Thang Long Tra Vinh Wind Power JSC
Location
Lương Hòa A, Châu Thành, Trà Vinh Province, Vietnam
First operating
2026

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Thăng Long wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.