Solar · United Kingdom
Tesco Pharmacy, Bidston - Solar Panels
Operator Batchelor Electrical Limited · Owner Batch 92 LTD
Awaiting Construction0.2 MWData checked 18 November 2026Source record dated 15 June 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tesco Pharmacy, Bidston - Solar Panels is a 0.2 MW solar farm on the edge of Wallasey, Merseyside, United Kingdom. Its planning application (SPVX/26/00242) went to Wirral on 17 February 2026 and was granted on 6 May 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 68 other energy sites within 10 km, 40 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Tesco Pharmacy, Bidston - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
BATCHELOR ELECTRICAL LIMITED (02679096), active, since 1992. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tesco Pharmacy, Bidston - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 38 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1244 | 2018 | Fire reported to have started in solar panels at Westleigh primary school | 38 km | Significant |
| EIR-1553 | 2017 | Roof fire involving 14 solar panels attended in Shropshire | 68 km | Minor |
| EIR-1485 | 2026 | Faulty solar panel wiring sparks house fire in Stoke-on-Trent | 71 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Batchelor Electrical Limited
- Owner
- Batch 92 LTD
- Location
- Tesco Pharmacy, Tesco Superstore Bidston Link Road, Bidston, Merseyside, CH43 7AA, United Kingdom
- Planning authority
- Wirral
- Planning application
- SPVX/26/00242
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for SPVX/26/00242, with what the planning evidence pack adds for this site.
Every application in Wirral · Alerts for applications and incidents near here
Timeline
- 17 February 2026 Planning application submitted
- 6 May 2026 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Tesco Pharmacy, Bidston - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Tesco Pharmacy, Bidston - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tesco Pharmacy, Bidston - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Tesco Pharmacy, Bidston - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 June 2026.
- Where is Tesco Pharmacy, Bidston - Solar Panels?
- On the edge of Wallasey, Merseyside, United Kingdom (postcode CH43 7AA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).