Battery storage · United Kingdom

Telford Way, Stephenson Road - Micro Energy Battery Storage

Operator AMP Clean Energy · Owner Aggregated Micro Power Holdings Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 21 November 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Telford Way, Stephenson Road - Micro Energy Battery Storage is a 0.2 MW battery storage site 3.9 km north-east of Colchester, Essex, United Kingdom. Its planning application (232193) went to Colchester on 15 September 2023 and was granted on 10 November 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 28 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

AMP CLEAN ENERGY LIMITED (11320925), active, since 2018. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Telford Way, Stephenson Road - Micro Energy Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 60 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction60 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells192 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire198 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
AMP Clean Energy
Owner
Aggregated Micro Power Holdings Limited
Location
Electricity Sub Station, Severalls Industrial Park, Stephenson Road, Colchester, Essex, CO4 9QP, United Kingdom
Planning authority
Colchester
Planning application
232193

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 232193, with what the planning evidence pack adds for this site.

Every application in Colchester · Alerts for applications and incidents near here

  • 15 September 2023 Planning application submitted
  • 10 November 2023 Planning permission granted
  • 10 November 2026 Planning permission expired

None found. The register holds no published incident that names Telford Way, Stephenson Road - Micro Energy Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Telford Way, Stephenson Road - Micro Energy Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Telford Way, Stephenson Road - Micro Energy Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Telford Way, Stephenson Road - Micro Energy Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 21 November 2023.
Where is Telford Way, Stephenson Road - Micro Energy Battery Storage?
3.9 km north-east of Colchester, Essex, United Kingdom (postcode CO4 9QP).