← Back to Shropshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Syspal, Cockshutt Lane - Solar Panels

Operator Syspal Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 26 January 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Syspal, Cockshutt Lane - Solar Panels is a 0.2 MW solar farm in Broseley, Shropshire, United Kingdom. Its planning application (22/05342/PSPPA) went to Shropshire on 5 December 2022 and was granted on 20 January 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Syspal, Cockshutt Lane - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0172, Fire at Wheat Leasows solar farm in Telford involves an electricity pylon, 11 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01722026Fire at Wheat Leasows solar farm in Telford involves an electricity pylon11 kmMinor
EIR-15472025Small fire within a solar panel at a house in Shropshire12 kmMinor
EIR-15502021Small fire involving solar panels at a property in Clun12 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Syspal Limited
Location
Syspal Ltd Cockshutt Lane, Shropshire, TF12 5JA, United Kingdom
Planning authority
Shropshire
Planning application
22/05342/PSPPA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/05342/PSPPA, with what the planning evidence pack adds for this site.

Every application in Shropshire · Alerts for applications and incidents near here

  • 5 December 2022 Planning application submitted
  • 20 January 2023 Planning permission granted

None found. The register holds no published incident that names Syspal, Cockshutt Lane - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Syspal, Cockshutt Lane - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Syspal, Cockshutt Lane - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Syspal, Cockshutt Lane - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2023.
Where is Syspal, Cockshutt Lane - Solar Panels?
In Broseley, Shropshire, United Kingdom (postcode TF12 5JA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).