Battery storage · United States

Syncarpha Puddon I Hybrid CSG

Operator Syncarpha Puddon I, LLC

Operational4 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Syncarpha Puddon I Hybrid CSG is a 4 MW battery storage site on the edge of Northbridge, Worcester County, Massachusetts, United States. It first operated in 2021. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 19 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 1 other site and 268 energy sites within 40 km for Syncarpha Puddon I Hybrid CSG

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (8 MWh)
Capacity
4 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Syncarpha Puddon I, LLC
Owner
Syncarpha Puddon I, LLC
Location
Worcester County, Massachusetts, United States
First operating
2021
Balancing authority
ISNE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Syncarpha Puddon I Hybrid CSG. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Syncarpha Puddon I Hybrid CSG had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Syncarpha Puddon I Hybrid CSG; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Syncarpha Puddon I Hybrid CSG?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Syncarpha Puddon I Hybrid CSG?
On the edge of Northbridge, Worcester County, Massachusetts, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).