Planning pack for this site, £295Other options

Solar · United Kingdom

Students Union Building - Solar Photovoltaic Panels

Operator Newcastle University

Awaiting ConstructionData checked 16 November 2026Source record dated 24 February 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Students Union Building - Solar Photovoltaic Panels is a solar farm in Newcastle upon Tyne, Tyne And Wear, United Kingdom. Its planning application (2022/0239/01/DET) went to Newcastle upon Tyne on 10 February 2022 and was granted on 6 April 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 118 other energy sites within 10 km, 82 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

NEWCASTLE UNIVERSITY HOLDINGS LIMITED (03068111), active, since 1995. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Students Union Building - Solar Photovoltaic Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1499, Solar panels linked to fires at council buildings in Northumberland, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14992025Solar panels linked to fires at council buildings in Northumberland12 kmSignificant
EIR-27212025Solar panel fire breaks out at Shanklea Primary School12 kmSignificant
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre40 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Newcastle University
Location
Newcastle University Students Union Building, Hadrian Building And Flying Wing Kings Walk, Newcastle Upon Tyne, Tyne And Wear, NE1 8QB, United Kingdom
Planning authority
Newcastle upon Tyne
Planning application
2022/0239/01/DET

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2022/0239/01/DET, with what the planning evidence pack adds for this site.

Every application in Newcastle upon Tyne · Alerts for applications and incidents near here

  • 10 February 2022 Planning application submitted
  • 6 April 2022 Planning permission granted
  • 6 April 2025 Planning permission expired

None found. The register holds no published incident that names Students Union Building - Solar Photovoltaic Panels. If you know of one, report it (confidential reports are anonymised).

Has Students Union Building - Solar Photovoltaic Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Students Union Building - Solar Photovoltaic Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Students Union Building - Solar Photovoltaic Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 February 2022.
Where is Students Union Building - Solar Photovoltaic Panels?
In Newcastle upon Tyne, Tyne And Wear, United Kingdom (postcode NE1 8QB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).