Battery storage · United Kingdom

Staythorpe Road - Battery energy storage

Operator Ecap Renewables (Elements Green) · Owner SSE Utility Solutions Limited

Under Construction360 MWData checked 16 November 2026Source record dated 22 September 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Staythorpe Road - Battery energy storage is a 360 MW battery storage site 3.5 km north-west of Newark on Trent, Nottinghamshire, United Kingdom. Its planning application (22/01840/FULM) went to Newark and Sherwood on 23 November 2022 and was granted on appeal on 3 May 2024. Construction started on 1 August 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 35 other energy sites within 10 km, 15 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

SSE UTILITY SOLUTIONS LIMITED (06894120), active, since 2009. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Staythorpe Road - Battery energy storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells18 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool141 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire168 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
360 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Ecap Renewables (Elements Green)
Owner
SSE Utility Solutions Limited
Location
S/O Staythorpe Road Staythorpe, Nottinghamshire, NG23, United Kingdom
Planning authority
Newark and Sherwood
Planning application
22/01840/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/01840/FULM, with what the planning evidence pack adds for this site.

Every application in Newark and Sherwood · Alerts for applications and incidents near here

  • 23 November 2022 Planning application submitted
  • 7 July 2023 Planning permission refused
  • 3 May 2024 Planning permission granted
  • 3 May 2024 Appeal granted
  • 1 August 2025 Construction started

None found. The register holds no published incident that names Staythorpe Road - Battery energy storage. If you know of one, report it (confidential reports are anonymised).

Has Staythorpe Road - Battery energy storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Staythorpe Road - Battery energy storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Staythorpe Road - Battery energy storage?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 22 September 2025.
Where is Staythorpe Road - Battery energy storage?
3.5 km north-west of Newark on Trent, Nottinghamshire, United Kingdom (postcode NG23).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).