Planning pack for this site, £295Other options

Battery storage · United Kingdom

Main Street, Kelham - Solar Farm & Battery Energy Storage

Operator Assured Asset Solar 2 Limited (Peridot Solar)

Awaiting Construction50 MWData checked 16 November 2026Source record dated 4 March 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Main Street, Kelham - Solar Farm & Battery Energy Storage is a 50 MW battery storage site 3.6 km north-west of Newark on Trent, Nottinghamshire, United Kingdom. Its planning application (23/01837/FULM) went to Newark and Sherwood on 17 October 2023 and was granted on appeal on 3 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 35 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Main Street, Kelham - Solar Farm & Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells18 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool142 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire170 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
50 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Assured Asset Solar 2 Limited (Peridot Solar)
Location
The W/O Main Street, Kelham, Newark, Nottinghamshire, NG23 5QP, United Kingdom
Planning authority
Newark and Sherwood
Planning application
23/01837/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/01837/FULM, with what the planning evidence pack adds for this site.

Every application in Newark and Sherwood · Alerts for applications and incidents near here

  • 17 October 2023 Planning application submitted
  • 31 January 2025 Planning permission refused
  • 3 December 2025 Appeal granted
  • 3 December 2028 Planning permission runs out

None found. The register holds no published incident that names Main Street, Kelham - Solar Farm & Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Main Street, Kelham - Solar Farm & Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Main Street, Kelham - Solar Farm & Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Main Street, Kelham - Solar Farm & Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 March 2025.
Where is Main Street, Kelham - Solar Farm & Battery Energy Storage?
3.6 km north-west of Newark on Trent, Nottinghamshire, United Kingdom (postcode NG23 5QP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).