Battery storage · United Kingdom
High Flatworth Battery Storage (Standby Embedded Stor Power Plant - Battery storage)
Operator Green Frog Power 214 Limited · Owner Pulse Clean Energy UK Limited
Operational20 MWData checked 16 November 2026Source record dated 16 January 2023
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
High Flatworth Battery Storage (Standby Embedded Stor Power Plant - Battery storage) is a 20 MW battery storage site on the edge of North Shields, Tyne And Wear, United Kingdom. Its planning application (21/01109/FUL) went to North Tyneside on 22 April 2021 and was granted on 16 June 2021. Construction started on 1 October 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 101 other energy sites within 10 km, 21 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when High Flatworth Battery Storage (Standby Embedded Stor Power Plant - Battery storage) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
A day out costs this site about £5,834 at its earnings over the last 31 settled days (response and reserve auctions). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The company behind this site
PULSE CLEAN ENERGY UK LIMITED (07609301), active, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 20 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational (Under Construction)
- Operator or applicant
- Green Frog Power 214 Limited
- Owner
- Pulse Clean Energy UK Limited
- Location
- Standby Embedded Stor Power Plant, High Flatworth, Tyne Tunnel Trading Estate, North Shields, Tyne And Wear, NE29 7UZ, United Kingdom
- Planning authority
- North Tyneside
- Planning application
- 21/01109/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/01109/FUL, with what the planning evidence pack adds for this site.
Every application in North Tyneside · Alerts for applications and incidents near here
Timeline
- 22 April 2021 Planning application submitted
- 16 June 2021 Planning permission granted
- 1 October 2022 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names High Flatworth Battery Storage (Standby Embedded Stor Power Plant - Battery storage). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has High Flatworth Battery Storage (Standby Embedded Stor Power Plant - Battery storage) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names High Flatworth Battery Storage (Standby Embedded Stor Power Plant - Battery storage); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of High Flatworth Battery Storage (Standby Embedded Stor Power Plant - Battery storage)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 January 2023.
- Where is High Flatworth Battery Storage (Standby Embedded Stor Power Plant - Battery storage)?
- On the edge of North Shields, Tyne And Wear, United Kingdom (postcode NE29 7UZ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).