Solar · United States
SR Middleton
Operator SR Middleton, LLC
Under construction55 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
SR Middleton is a 55 MW solar farm 13 km south-east of Bolivar, Hardeman County, Tennessee, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when SR Middleton changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for SR Middleton sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1934, Solar inverter fire at Sunflower Solar after an explosion call, 223 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1934 | 2022 | Solar inverter fire at Sunflower Solar after an explosion call | 223 km | Minor |
| EIR-0438 | 2025 | Solar inverter fire extinguished at solar farm near Robards, Kentucky | 302 km | Minor |
| EIR-1255 | 2025 | Field fire at solar farm north of Carmi contained to vegetation | 330 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 55 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Under construction
- Operator
- SR Middleton, LLC
- Owner
- SR Middleton, LLC
- Location
- Hardeman County, Tennessee, United States
- Expected
- 2027
- Balancing authority
- TVA
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names SR Middleton. If you know of one, report it (confidential reports are anonymised).
Questions
- Has SR Middleton had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names SR Middleton; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of SR Middleton?
- Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is SR Middleton?
- 13 km south-east of Bolivar, Hardeman County, Tennessee, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).