Battery storage · United States

South River BESS Phase 1

Operator South River OnSite Generation, LLC

Operational9.9 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

South River BESS Phase 1 is a 9.9 MW battery storage site in South River, Middlesex County, New Jersey, United States. It first operated in 2025. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 42 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

321 energy sites within 40 km for South River BESS Phase 1

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (16 MWh)
Capacity
9.9 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
South River OnSite Generation, LLC
Owner
South River OnSite Generation, LLC
Location
Middlesex County, New Jersey, United States
First operating
2025
Balancing authority
PJM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names South River BESS Phase 1. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has South River BESS Phase 1 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names South River BESS Phase 1; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of South River BESS Phase 1?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is South River BESS Phase 1?
In South River, Middlesex County, New Jersey, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).