Solar · Germany
Solarpark Lisberg II
Operator MÜZ Sonnenpark Trabelsdorfer Hof GmbH & Co. KG
Planned16.5 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Solarpark Lisberg II is a 16.5 MW solar farm 7.2 km west of Bischberg, Lisberg, Bamberg, Bayern, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 17 other energy sites within 10 km, 11 of them solar farms. The register holds no incident at this site. It holds 6 incidents at solar farms in Germany, and 456 worldwide.
Get an email when Solarpark Lisberg II changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Solarpark Lisberg II sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 6 comparable solar incidents in Germany, nearest first. The nearest is EIR-2629, Fire breaks out in technical room of Hesse solar park, 117 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2629 | 2024 | Fire breaks out in technical room of Hesse solar park | 117 km | Significant |
| EIR-1328 | 2026 | Battery storage fire at solar installation in Reichenbach | not mapped | Significant |
| EIR-2839 | 2026 | Battery storage at solar park near Schnaittenbach, Germany, burns out | not mapped | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 3 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 16.5 MW
- Capacity figure from
- Marktstammdatenregister (Bundesnetzagentur, Germany)
- Status
- Planned (In planning)
- Operator
- MÜZ Sonnenpark Trabelsdorfer Hof GmbH & Co. KG
- Location
- Lisberg, Bamberg, Bayern, 96170, Germany
- First operating
- 2027
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Solarpark Lisberg II. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Solarpark Lisberg II had a fire or other incident?
- None is on the register as of 10 November 2026. The register holds no published incident that names Solarpark Lisberg II; it holds 6 incidents at solar farms in Germany.
- What is the status of Solarpark Lisberg II?
- Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
- Where is Solarpark Lisberg II?
- 7.2 km west of Bischberg, Lisberg, Bamberg, Bayern, Germany (postcode 96170).
Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).