← Back to Nevada

Battery storage · United States

Sierra Solar Hybrid

Operator Sierra Pacific Power Co

Operational400 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sierra Solar Hybrid is a 400 MW battery storage site 33 km north-east of Fernley, Churchill County, Nevada, United States. It first operated in 2026. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 2 other sites and 3 energy sites within 40 km for Sierra Solar Hybrid

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (1600 MWh)
Capacity
400 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Sierra Pacific Power Co
Owner
Sierra Pacific Power Co
Location
Churchill County, Nevada, United States
First operating
2026
Balancing authority
NEVP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Sierra Solar Hybrid. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Sierra Solar Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sierra Solar Hybrid; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Sierra Solar Hybrid?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Sierra Solar Hybrid?
33 km north-east of Fernley, Churchill County, Nevada, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).