Around this site

← Back to Shandong

Onshore wind · China

Shandong Lingcheng Huiwangzhuang wind farm

Planned (permitted)50 MWChecked 8 October 2026Last changed in the dataset 19 February 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Shandong Lingcheng Huiwangzhuang wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
50 MW
Status
Planned (permitted) (Pre-construction)
Operator
Dezhou Lingcheng Jierong New Energy Technology
Owner
Beijing Shouhuaxin Wind Power Technology Co Ltd [100%]
Location
Qiansun, Dezhou, Shandong, China

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Shandong Lingcheng Huiwangzhuang wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.