← Back to Texas
Planning pack for this site, £295Other options

Solar · United States

Selenite Springs Solar

Operator NextEra Energy Resources - ERCOT

Planned250 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Selenite Springs Solar is a 250 MW solar farm 20 km north-west of Fort Stockton, Pecos County, Texas, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There are 2 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Selenite Springs Solar sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1366, Solar panels catch fire at a cinema in south Austin, 445 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13662023Solar panels catch fire at a cinema in south Austin445 kmMinor
EIR-16432025Brush fire near solar farm started by grass cutting472 kmMinor
EIR-14752026Solar panel fire displaces residents at Amarillo apartment complex482 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
250 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
NextEra Energy Resources - ERCOT
Owner
NextEra Energy Resources - ERCOT
Location
Pecos County, Texas, United States
Expected
2027
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Selenite Springs Solar. If you know of one, report it (confidential reports are anonymised).

Has Selenite Springs Solar had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Selenite Springs Solar; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Selenite Springs Solar?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Selenite Springs Solar?
20 km north-west of Fort Stockton, Pecos County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).