Battery storage · United Kingdom
Sefton Lane New Build Generating CMU
Operator Shaw-Energi Ltd
Operational20 MWData checked 5 November 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Sefton Lane New Build Generating CMU is a 20 MW battery storage site on the edge of Maghull, United Kingdom. Its status in the public dataset is operational. There are 88 other energy sites within 10 km, 26 of them battery storage sites. The register holds no incident at this site. It holds 14 incidents at battery storage sites in the United Kingdom, and 196 worldwide.
Get an email when Sefton Lane New Build Generating CMU changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
SHAW-ENERGI LTD (03949279), active, since 2000. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Battery)
- Capacity
- 20 MW
- Status
- Operational (Capacity Market unit, delivery year 2021)
- Operator
- Shaw-Energi Ltd
- Location
- L31 8BX, United Kingdom
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Sefton Lane New Build Generating CMU. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Sefton Lane New Build Generating CMU had a fire or other incident?
- None is on the register as of 10 November 2026. The register holds no published incident that names Sefton Lane New Build Generating CMU; it holds 14 incidents at battery storage sites in the United Kingdom.
- What is the status of Sefton Lane New Build Generating CMU?
- Operational, in the public dataset.
- Where is Sefton Lane New Build Generating CMU?
- On the edge of Maghull, United Kingdom (postcode L31 8BX).
The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).