Planning pack for this site, £295Other options

Solar · United Kingdom

Sawston Solar Farm Land North of Dales Manor Business Park

Operator Sawston Solar Farm

Revised28 MWData checked 16 November 2026Source record dated 30 June 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sawston Solar Farm Land North of Dales Manor Business Park is a 28 MW solar farm on the edge of Sawston, Cambridgeshire, United Kingdom. Its planning application (S/1615/14/FL) went to South Cambridgeshire on 28 July 2014 and was refused on appeal on 15 June 2016. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 31 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Sawston Solar Farm Land North of Dales Manor Business Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1262, Fire reported on solar-panel roof at Fitzwilliam College auditorium, 7.5 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium7.5 kmMinor
EIR-14932026Solar panels catch fire on Bedford warehouse roof41 kmMinor
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire56 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
28 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Sawston Solar Farm
Location
N/O Dales Manor Business Park, West Way, Cambridge, Cambridgeshire, CB2, United Kingdom
Planning authority
South Cambridgeshire
Planning application
S/1615/14/FL
Appeal reference
APP/W0530/W/15/3012014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/1615/14/FL, with what the planning evidence pack adds for this site.

Every application in South Cambridgeshire · Alerts for applications and incidents near here

  • 28 July 2014 Planning application submitted
  • 7 October 2014 Planning permission refused
  • 6 October 2015 Appeal lodged
  • 15 June 2016 Appeal refused

None found. The register holds no published incident that names Sawston Solar Farm Land North of Dales Manor Business Park. If you know of one, report it (confidential reports are anonymised).

Has Sawston Solar Farm Land North of Dales Manor Business Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sawston Solar Farm Land North of Dales Manor Business Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Sawston Solar Farm Land North of Dales Manor Business Park?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 30 June 2016.
Where is Sawston Solar Farm Land North of Dales Manor Business Park?
On the edge of Sawston, Cambridgeshire, United Kingdom (postcode CB2).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).