Around this site

← Back to Canarias

Offshore wind · Spain

San Borondón wind farm

Planned (permitted)238 MWChecked 8 October 2026Last changed in the dataset 31 March 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for San Borondón wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Offshore wind
Capacity
238 MW
Status
Planned (permitted) (Pre-construction)
Owner
Iberdrola Renovables Energia SA [100%]
Location
San Bartolomé de Tirajana, Gran Canaria, Canarias, Spain

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names San Borondón wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.