Around this site

← Back to Setúbal

Solar · Portugal

Sado (Brisa) solar farm

Operational12.5 MWChecked 8 October 2026Last changed in the dataset 5 December 2025

Technology
Solar
Capacity
12.5 MW
Status
Operational (Operating)
Operator
Brisa Esparsa Energias Renovaveis
Owner
Finerge SA
Location
Alcacer do Sal, Setúbal, Portugal
First operating
2021

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Sado (Brisa) solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.