← Back to Cumbria

Energy sites / United Kingdom / Cumbria

Battery storage · United Kingdom

Roosecote

Operational49 MWChecked 6 October 2026Last changed in the dataset 30 November 2018

Technology
Battery storage (Stand-alone Storage)
Capacity
49 MW
Status
Operational
Operator or applicant
Centrica
Location
Roosecote coal and gas-fired power station, Barrow-in-Furness, Cumbria, UK, Cumbria, LA13 0PQ, United Kingdom
Planning authority
Westmorland and Furness
First operating
2018

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 1 March 2017 Construction started
  • 30 November 2018 Operational

None found. The register holds no published incident that names Roosecote. If you know of one, report it (confidential reports are anonymised).

The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.