← Back to Alberta
Planning pack for this site, £295Other options

Solar · Canada

Rocktree Solar Project

Owner Voltarix Group INC (VGI) [100%]

Under construction25 MWData checked 8 October 2026Source record dated 13 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Rocktree Solar Project is a 25 MW solar farm on the edge of Spruce Grove, Parkland County, Alberta, Canada. It first operated in 2026. Its status in the Global Energy Monitor solar and wind trackers is under construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 4 incidents at solar farms (hybrid battery and solar sites included) in Canada, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Rocktree Solar Project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 4 comparable solar incidents in Canada, nearest first. The nearest is EIR-1701, Solar panels and roof catch fire at SimTech Supply Chain Management in West Lorne, 2658 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-17012025Solar panels and roof catch fire at SimTech Supply Chain Management in West Lorne2658 kmMinor
EIR-15112016Solar panels catch fire on roof of Mississauga home2714 kmMinor
EIR-01612026Battery fire at Summerside Sunbank solar farm triggers evacuation order3593 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 1 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
25 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Under construction (Construction)
Owner
Voltarix Group INC (VGI) [100%]
Location
Parkland County, Alberta, Canada
First operating
2026

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Rocktree Solar Project. If you know of one, report it (confidential reports are anonymised).

Has Rocktree Solar Project had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Rocktree Solar Project; it holds 4 incidents at solar farms (hybrid battery and solar sites included) in Canada.
What is the status of Rocktree Solar Project?
Under construction, in the Global Energy Monitor solar and wind trackers, where it last changed on 13 January 2026.
Where is Rocktree Solar Project?
On the edge of Spruce Grove, Parkland County, Alberta, Canada.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).