← Back to Arizona

Battery storage · United States

Roadrunner Solar and BESS

Operator Clenera LLC

Operational235 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Roadrunner Solar and BESS is a 235 MW battery storage site Cochise County, Arizona, United States. It first operated in 2026. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 5 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 1 other site and 18 energy sites within 40 km for Roadrunner Solar and BESS

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (411 MWh)
Capacity
235 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Clenera LLC
Owner
Clenera LLC
Location
Cochise County, Arizona, United States
First operating
2026
Balancing authority
WALC

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Roadrunner Solar and BESS. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Roadrunner Solar and BESS had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Roadrunner Solar and BESS; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Roadrunner Solar and BESS?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Roadrunner Solar and BESS?
Cochise County, Arizona, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts.