← Back to East Sussex
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Ringmer - Solar array/Battery storage

Operator Ouse Valley Energy Services Company CIC

Awaiting ConstructionData checked 16 November 2026Source record dated 19 February 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Ringmer - Solar array/Battery storage is a battery storage site 4.7 km north-east of Lewes, East Sussex, United Kingdom. Its planning application (LW/22/0254) went to Lewes on 11 April 2022 and was granted on 19 January 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 23 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ringmer - Solar array/Battery storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 69 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction69 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire165 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter249 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Ouse Valley Energy Services Company CIC
Location
E/O Uckfield Road (A26) Ringmer, East Sussex, BN8 5FR, United Kingdom
Planning authority
Lewes
Planning application
LW/22/0254

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LW/22/0254, with what the planning evidence pack adds for this site.

Every application in Lewes · Alerts for applications and incidents near here

  • 11 April 2022 Planning application submitted
  • 19 January 2023 Planning permission granted
  • 19 January 2026 Planning permission expired

None found. The register holds no published incident that names Ringmer - Solar array/Battery storage. If you know of one, report it (confidential reports are anonymised).

Has Ringmer - Solar array/Battery storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ringmer - Solar array/Battery storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Ringmer - Solar array/Battery storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 February 2026.
Where is Ringmer - Solar array/Battery storage?
4.7 km north-east of Lewes, East Sussex, United Kingdom (postcode BN8 5FR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).