Planning pack for this site, £295Other options

Solar · United Kingdom

Red House Farm - Solar Farm

Operator Anesco Limited · Owner Quanesco Midco Limited

Awaiting Construction20 MWData checked 16 November 2026Source record dated 14 December 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Red House Farm - Solar Farm is a 20 MW solar farm 4.5 km south-east of Sawtry, Cambridgeshire, United Kingdom. Its planning application (21/01809/FUL) went to Huntingdonshire on 4 August 2021 and was granted on 7 December 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 15 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Red House Farm - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1155, Rooftop solar fire contained on a Peterborough warehouse roof, 17 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof17 kmSignificant
EIR-14932026Solar panels catch fire on Bedford warehouse roof33 kmMinor
EIR-15452024Fire involving solar panels on a building under construction in Kettering34 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Anesco Limited
Owner
Quanesco Midco Limited
Location
Nw/O Red House Farm On Double, Bank Lane, Sawtry, Huntingdon, Cambridgeshire, PE28, United Kingdom
Planning authority
Huntingdonshire
Planning application
21/01809/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/01809/FUL, with what the planning evidence pack adds for this site.

Every application in Huntingdonshire · Alerts for applications and incidents near here

  • 4 August 2021 Planning application submitted
  • 7 December 2021 Planning permission granted
  • 7 December 2024 Planning permission expired

None found. The register holds no published incident that names Red House Farm - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Red House Farm - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Red House Farm - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Red House Farm - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 December 2021.
Where is Red House Farm - Solar Farm?
4.5 km south-east of Sawtry, Cambridgeshire, United Kingdom (postcode PE28).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).