Planning pack for this site, £295Other options

Battery storage · United Kingdom

Rammerscales Sawmill - Solar Array & Battery Storage

Operator A & G King Timber Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 25 February 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Rammerscales Sawmill - Solar Array & Battery Storage is a battery storage site 9.3 km east of Locharbriggs, Dumfries and Galloway, United Kingdom. Its planning application (24/2284/FUL) went to Dumfries and Galloway on 7 November 2024 and was granted on 6 February 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 13 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Rammerscales Sawmill - Solar Array & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 192 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool192 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells266 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire388 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
A & G King Timber Limited
Location
Rammerscales Sawmill, Dumfries and Galloway, DG11 1LD, United Kingdom
Planning authority
Dumfries and Galloway
Planning application
24/2284/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/2284/FUL, with what the planning evidence pack adds for this site.

Every application in Dumfries and Galloway · Alerts for applications and incidents near here

  • 7 November 2024 Planning application submitted
  • 6 February 2025 Planning permission granted
  • 6 February 2028 Planning permission runs out

None found. The register holds no published incident that names Rammerscales Sawmill - Solar Array & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Rammerscales Sawmill - Solar Array & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Rammerscales Sawmill - Solar Array & Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Rammerscales Sawmill - Solar Array & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 February 2025.
Where is Rammerscales Sawmill - Solar Array & Battery Storage?
9.3 km east of Locharbriggs, Dumfries and Galloway, United Kingdom (postcode DG11 1LD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).